中文| English
Member Units
金沙澳门官网4066

Shenzhen Energy East Power Plant

金沙澳门官网4066

Address:Dapeng District, Shenzhen City, Guangdong Province

  • Code: 518120
  • Mailbox: db_bgs@sec.com.cn
  • Telephone: 0755-84213301
  • Fax: 0755-84213300
金沙澳门官网4066
The East Power Plant, with a total capacity of 9 × 350MW, has adopted global-leading gas-steam combined cycle power generation technology, and is a major construction project in Shenzhen.
  • 金沙js7799
上一个下一个

The East Power Plant, with a total capacity of 9 × 350MW, has adopted global-leading gas-steam combined cycle power generation technology, and was a major construction project in Shenzhen. Shenzhen Energy East Power Plant is to be constructed in two phases. Three 350 MW gas-fired combined cycle units in Phase I, with a total investment of approximately 3.9 billion RMB, were put into operation in 2007, while the construction of six 350 MW units in Phase II are actively ongoing. These units adopt globally state-of-the-art and mature gas-steam combined cycle power generation technologies, use liquefied natural gas (LNG) as the clean energy fuel and consume less fresh water. It is recognized as a modern and green power plant in the world.

金沙js7799

@SHENZHEN ENERGY Corporation All Rights Reserved.